电子bb赌博网址

400-6599-868
  • Henan 15138907650
  • Henan 15981830786
  • Hubei 15188305605
  • Shandong 15137186313
  • Anhui 15136127973
  • Shanxi 15736761601
  • Shaanxi 18703812258
  • Guizhou 18738170989
  • Scan QR code to visit mobile station 二维码
    欢迎访问河南新旭体育设施有限公司官方网站! Favorites | Set Homepage | Contact Us | Company Stores Welcome to visit Henan Xinxu Sports Facilities Co., Ltd. official website!
    0371-56680629 National Service Hotline: 400-6599-868 0371-56680629

    塑胶跑道

    Standard plastic runway material supplier
    New Concept Materials <br /> China Environmental Labeling Product Certification

    Popular keywords: plastic runway material new national standard plastic stadium new national standard silicon PU plastic new national standard Henan plastic runway material new national standard Henan plastic stadium new national standard Henan silicon PU plastic new national standard silicon PU

    contact us
    Hotline
    0371-56680629
    National After Sales Hotline: 13837161188
    Email: 244579738@qq.com
    Headquarters Address: 1503-1505, Building 1, Binhu International Area 3, Greenland, South University Road, Zhengzhou City, Henan Province

    Plastic stadium

    Release time: 2016/5/17

    Brand:

    Phone: 0371-56680629
    share to: Copy more
    product description



     塑胶球场

    New cement foundation requirements for plastic stadiums :

    Solid leveling (flatness requirements: 3m ruler error is not greater than 3mm), drainage slope (generally no greater than 40/00 horizontally, no greater than 20/00 longitudinally, water leakage must be guaranteed), the strength reaches the strength of building concrete standard C20, pouring After the system is made, it should retain water for no less than 7 days, and the overall curing time should be no less than 28 days (to ensure the curing time of the cement, so that the white powder generated by the cement during the curing process will precipitate out of the base surface). After the new cement foundation is poured, the reasonable temperature expansion joints are cut. The principle is to cut a block of no more than 6x10m. If the temperature joints are cut between the plates cast in separate plates, the cutting temperature joints must be 4 ~ 5mm wide and the depth is 1 / 2 to 2/3, (ensure that the thermal expansion and contraction of the foundation can be concentrated in the temperature gap and will not cause cracks in other parts of the foundation).


    Henan Xinxu Sports
    Henan Xinxu Sports Facilities Co., Ltd.



    Contact: Mr. Wang

    Phone: 13837161188

    Landline: 0371-56680629

    400 Tel: 400-6599-868

    Email: 244579738@qq.com

    Address: 1503-1505, Building 1, Binhu International Area 3, Greenland, South University Road, Zhengzhou City, Henan Province


    Online consultation on plastic stadium
    username:
    contact number:
    Online QQ:
    E-mail:
    content:
    赌博网安全网址 威尼斯十大赌博网 真钱滚球现金 正规网赌盘口app平台 赌博网盘口平台 bet网络网上赌博 现金网盘口真人 365真人安全赌场 现金真人官方网 真钱网赌开户