电子bb赌博网址

400-6599-868
  • Henan 15138907650
  • Henan 15981830786
  • Hubei 15188305605
  • Shandong 15137186313
  • Anhui 15136127973
  • Shanxi 15736761601
  • Shaanxi 18703812258
  • Guizhou 18738170989
  • Scan QR code to visit mobile station 二维码
    欢迎访问河南新旭体育设施有限公司官方网站! Favorites | Set Homepage | Contact Us | Company Stores Welcome to visit Henan Xinxu Sports Facilities Co., Ltd. official website!
    0371-56680629 National Service Hotline: 400-6599-868 0371-56680629

    塑胶跑道

    Standard plastic runway material supplier
    New Concept Materials <br /> China Environmental Labeling Product Certification

    Popular keywords: plastic runway material new national standard plastic stadium new national standard silicon PU plastic new national standard Henan plastic runway material new national standard Henan plastic stadium new national standard Henan silicon PU plastic new national standard silicon PU

    contact us
    Hotline
    0371-56680629
    National After Sales Hotline: 13837161188
    Email: 244579738@qq.com
    Headquarters Address: 1503-1505, Building 1, Binhu International Area 3, Greenland, South University Road, Zhengzhou City, Henan Province
    Position: Home > News > News
    Importance of surveying construction of plastic runways
    Author: admin Published: 2019/4/16 0:00:00 concerned about the number of times: QR code sharing

    The coating industry is known as "three points of materials, seven points of construction", so construction technology is very important for floor coating projects. Similarly, the quality control of construction is also very important. Let's take a look at the engineering control measurement and construction measurement of the plastic runway .

    1. After entering the site, the compounding of pile crossing control points and maintenance operations should be strictly performed. According to the actual conditions of the construction site, the temporary level point should be arranged at a relatively fixed point, and the concrete pile should be used as the lead pile.



    2. Determine the control columns of the track centerline and sidelines according to the site crossing points, survey the underground underground pipe network, the layout of the site, and the surrounding buildings and structures.

    3. According to the construction drawing, use the theodolite to measure one side of the playground from the dot, then use this side as the baseline to push out the other three sides. When measuring the length of the rectangular side, set up positioning piles on each side extension line.

    4. Determine a 10m * 10m grid on the site topographic map, and locate each point on the ground with a wooden stake. At the end of each layer construction, before the construction of the upper layer structure, it should be measured at each point on the grid, and it should be reflected in the drawings in time to grasp the construction thickness of the structure layer.

    Measuring and controlling outlets is the foundation of construction, and preparations must be made.